Map of Inaugural Ceremony and Parade Street Closures [PDF]
Read this information in Amharic (አማርኛ)
The vehicle restrictions and street closures listed below are in effect for the Inaugural Ceremony and Parade beginning on Friday, January 20, at 3 am (unless otherwise noted) until the parade concludes at approximately 6 pm.
Street and Bridge Closures
- 14th St. Bridge (General purpose lanes) – Open. All traffic diverted to the Southeast/Southwest freeway.
- 14th St. Bridge HOV (North and South) – Closed to all traffic
- Theodore Roosevelt Bridge – Open. Traffic will be diverted north on Potomac River Freeway.
- Memorial Bridge – Restricted to pedestrians and authorized vehicles only.
- Key Bridge – Open to all traffic
- Chain Bridge – Open to all traffic
- South Capitol St. Bridge – Open to all traffic
- Southeast/Southwest Freeway – Open to all traffic
- Rock Creek Parkway – Open to traffic north of Virginia Ave (Holiday traffic schedule is in effect throughout the park)
- Clara Barton Parkway operating under Holiday schedule (2 way traffic all day)
- 11th St. Bridges – Open to all traffic
- Sousa Bridge – Open to all traffic
- East Capitol St. – Open to all traffic but roadways around RFK may have increased bus and pedestrian traffic in the area
- Benning Road – Open to all traffic
- New York Ave. – Open to all traffic
- 3rd St. Tunnel – Closed to all traffic (Closure at 6:00 a.m., Friday, January 20)
- 9th St. Tunnel – Closed to all traffic
- 12th St. Tunnel – Closed to all traffic
- E St. Tunnel – Closed to all traffic
- Independence Ave/Maine Ave from 12th St., SW to Memorial Bridge – Closed to all traffic
- Ohio Dr. from Inlet Bridge to 23rd St – Closed to all traffic
- Ohio Dr. from Independence Ave to Rock Creek Parkway – Closed to all traffic